OAKS CHRISTIAN

MIDDLE SCHOOL RENOVATION

WESTLAKE VILLAGE, CA
 
2009
72,000SF
CONSTRUCTION COST: $11.5M

Renovated industrial building for 6-8th grades. Classrooms at each grade are clustered around commons areas.

 

Contains a kitchen, cafeteria, library, computer labs, fine arts rooms, performing arts hall. Our work also includes campus master planning, sports fields, and bridges over the county flood control channel.

SEVEN ARROWS INNOVATION LABS

PACIFIC PALISADES, CA

4,000 SF RENOVATION
2016

KAYNE ERAS CENTER

CULVER CITY, CA
 
2002
40,000SF
CONSTRUCTION COST: $4.7M

A special education preschool and high school.

Contains counseling offices, teacher/staff training areas, adult education classrooms, and a large multi-purpose hall that may be used as a gymnasium or as an auditorium.

LOS ANGELES

COMMUNITY COLLEGE

RENOVATION

LOS ANGELES, CA
 
2010
214,000SF
CONSTRUCTION COST: $22M

Modernization of existing 214,000sf following the school's 10 year master plan.

 

Work includes ada upgrades, abatement of hazardous materials, structural upgrades, and the addition of new fenestration. Planning included establishing administrative and classroom clusters for 7 academic departments. 65 highly advanced classrooms.

WILLOWS SCHOOL

GYM, AUDITORIUM, AND LIBRARY

CULVER CITY, CA
 
2003
34,000SF
CONSTRUCTION COST: $8M

Renovation of industrial space to create a new middle school and library that has clearstory daylighting.

 

The program includes 6 middle school classrooms, a computer lab, a commons space and middle school library, and outdoor playgrounds, drop off zones and parking were reconfigured to take better advantage of the limited site area.

CIENAGA ELEMENTARY SCHOOL

LOS ANGELES, CA
 
2006
18,000SF
CONSTRUCTION COST: $6.6M

14 classrooms and offices in a new 2-story building is part of a larger elementary school complex that frames a playground.

 

Classrooms conform to state and district standards for smart classroom technology and have high ceilings and ample natural light. The design incorporates sustainability measures through motion and daylight sensors for the lighting and and central energy management.

RANCHO CIENAGA CHILDCARE CENTER

LOS ANGELES, CA
 
2001
6,000SF
CONSTRUCTION COST: $1.4M

This primary center built for the city of la parks and recreation department helps fill a long-standing need for childcare and community education space for underserved parts of the city.

VICTORY VALLEY CHILDCARE CENTER

LOS ANGELES, CA
 
2003
6,200SF
CONSTRUCTION COST:$2.1M

Multi-classroom building set at edge of a city park. Contains kitchen, study center, 2 care rooms, offices, and enclosed playgrounds.

 

A shaded glass wall separates the interior and exterior spaces. Layered glass enclosed spaces provide easy supervision, security, and ample natural light.

The Albert Group Architects     2032 Stoner Avenue, Los Angeles, CA 90025     310-820-8863
All images, drawings, renderings, pictures, videos and other electronic media on this website are the property of The Albert Group Architects. Any unauthorized use, reproduction, or dissemination of this media is strictly prohibited.