CARSDIRECT.COM CONVERTED OFFICE SPACE

CULVER CITY, CA

 

2002

AREA: 76,000SF

CONSTRUCTION COST: $4.5 m

Conversion of an aging industrial building into creative office space. The tilt up concrete and masonry walls were sandblasted to provide a textured backdrop for entry pieces of glass and stainless steel, and the interiors employ a similar rough and smooth vocabulary. New sections of wood are bolted on to the existing wood bowstring trusses. The connections are celebrated in great detail and form the backdrop for metal, glass and smooth drywall office enclosures.

THE PARK 

DOWNTOWN LOS ANGELES, CA

Five-building interconnected office complex: Downtown Los Angeles.

A series of elevated walkways through each building connecting interior courtyards and vertical circulation nodes. Over 250,000 SF of office space, showrooms and restaurants. Post-tensioned concrete slabs and modular wall panel systems construction.

ORTHOPEDIC MEDICAL OFFICE 

LOS ANGELES, CA

FORD AEROSPACE CORPORATION WESTERN REGIONAL HEADQUARTERS

SAN JOSE, CA
1992
540,000SF
CONSTRUCTION COST: $27M

4 interconnected building campus containing flexible R&D, design, and small products manufacturing space. The buildings are clustered to create a square and central drop-off zone. The steel frame structures are clad in lightweight precast concrete panels, and each building is edged with an outdoor gallery space and linked to the others with covered arcades.

 

A fast-track project delivery system was utilized. The building footprints and structural bay spacings were determined early on, allowing purchase of steel sections and site grading well ahead of design completion, saving almost six months from design to occupancy period.

HUGHES AIRCRAFT OFFICES

EL SEGUNDO, CA
 
2001
201,000SF
CONSTRUCTION COST: $14.5M

Houses an aerospace company's R&D and manufacturing program organized in a rectangular plan with 3 large interior courtyards. The entrance is expressed as a three-story skylit atrium. The occupied floors are steel frame clad in a combination of rose-hued lightweight precast concrete panels and grey aluminum curtain walls. The panels and curtain wall are detailed as layers within layers to reduce the massiveness of the large floor plates. A fast-track construction system was used.

COMSTOCK  HOMES

OFFICE BUILDING (LEFT)

MANHATTAN BEACH, CA

ULTRASYSTEMS

OFFICE BUILDING (RIGHT)

EL SEGUNDO, CA
 

LA GRANGE AVE.

OFFICE

LOS ANGELES, CA

NATIONAL EDUCATION CENTER BUILDING

LOS ANGELES, CA